當(dāng)前位置:首頁(yè)>新聞資訊>新聞動(dòng)態(tài)異形雙曲鋼結(jié)構(gòu)柱倒序安裝施工工法

異形雙曲鋼結(jié)構(gòu)柱倒序安裝施工工法

來(lái)源:http://genomecards.com 日期:2025-02-11 發(fā)布人:

一、工法特點(diǎn)

1、 Characteristics of construction methods

精度控制優(yōu)勢(shì)

Precision control advantage

倒序安裝是從頂部結(jié)構(gòu)開(kāi)始向下安裝,與常規(guī)順序安裝相比,在安裝過(guò)程中更容易對(duì)異形雙曲鋼結(jié)構(gòu)柱的頂部節(jié)點(diǎn)進(jìn)行準(zhǔn)確定位。因?yàn)轫敳抗?jié)點(diǎn)通常是與其他主要結(jié)構(gòu)(如屋面梁等)相連接的關(guān)鍵部位,倒序安裝可以先確定這個(gè)關(guān)鍵部位的空間位置,通過(guò)準(zhǔn)確的測(cè)量和調(diào)整手段,如使用全站儀等高精度測(cè)量?jī)x器,將頂部節(jié)點(diǎn)的誤差控制在極小范圍內(nèi),從而為后續(xù)柱體的安裝提供準(zhǔn)確的基準(zhǔn)。

Reverse installation starts from the top structure and is installed downwards. Compared with conventional sequential installation, it is easier to accurately locate the top nodes of the irregular hyperbolic steel structure columns during the installation process. Because the top node is usually a critical part connected to other major structures such as roof beams, reverse installation can first determine the spatial position of this critical part. Through accurate measurement and adjustment methods, such as using high-precision measuring instruments such as total stations, the error of the top node can be controlled within a very small range, providing accurate benchmarks for the subsequent installation of columns.

施工性提升

Improvement of construction safety

采用倒序安裝,在安裝上部結(jié)構(gòu)時(shí),下方的作業(yè)空間相對(duì)開(kāi)闊,減少了下方已安裝結(jié)構(gòu)對(duì)施工設(shè)備和人員的潛在威脅。例如,在安裝過(guò)程中,起重機(jī)等設(shè)備的起吊和移動(dòng)不會(huì)受到下部已安裝結(jié)構(gòu)的阻礙,降低了碰撞風(fēng)險(xiǎn)。而且,施工人員在高處作業(yè)時(shí),下方尚未安裝的部分可以提供更好的視野和操作空間,有利于防護(hù)措施的實(shí)施。

By using reverse installation, when installing the upper structure, the working space below is relatively open, reducing the potential safety threats to construction equipment and personnel from the already installed structure below. For example, during the installation process, the lifting and movement of equipment such as cranes will not be hindered by the lower installed structure, reducing the risk of collision. Moreover, when construction personnel work at heights, the uninstalled parts below can provide better visibility and operating space, which is conducive to the implementation of safety protection measures.

質(zhì)量保證措施有效

Effective quality assurance measures

由于是倒序安裝,每安裝一節(jié)柱體都可以對(duì)已安裝部分進(jìn)行質(zhì)量檢查和調(diào)整。在安裝下一節(jié)柱體時(shí),可以通過(guò)預(yù)拼裝等方式確保與上一節(jié)柱體的連接精度,使整個(gè)異形雙曲鋼結(jié)構(gòu)柱的線形更加順暢。例如,對(duì)于雙曲造型部分,可以在地面上進(jìn)行預(yù)拼裝,檢查相鄰柱體之間的曲面過(guò)渡是否自然、接口是否緊密,從而保證整個(gè)結(jié)構(gòu)的質(zhì)量符合設(shè)計(jì)要求。

02

Due to the reverse installation, eachinstalled section of the column can undergo quality inspection and adjustment of the already installed parts. When installing the next section of the column, the connection accuracy with the previous section can be ensured through pre assembly and other methods, making the overall shape of the irregular hyperbolic steel structure column smoother. For example, for the hyperbolic shaped part, pre assembly can be carried out on the ground to check whether the curved transitions between adjacent columns are natural and whether the interfaces are tight, thereby ensuring that the quality of the entire structure meets the design requirements.

二、施工工藝流程

2、 Construction process flow

施工準(zhǔn)備

Construction preparation

技術(shù)準(zhǔn)備:仔細(xì)研讀設(shè)計(jì)圖紙,對(duì)異形雙曲鋼結(jié)構(gòu)柱的形狀、尺寸、材質(zhì)、連接方式等技術(shù)參數(shù)進(jìn)行詳細(xì)分析。利用BIM(建筑信息模型)技術(shù)對(duì)鋼結(jié)構(gòu)柱進(jìn)行三維建模,模擬安裝過(guò)程,提前發(fā)現(xiàn)可能存在的問(wèn)題,如構(gòu)件之間的碰撞、安裝順序不合理等,并制定相應(yīng)的解決方案。同時(shí),根據(jù)設(shè)計(jì)要求和規(guī)范標(biāo)準(zhǔn),編制詳細(xì)的施工方案和質(zhì)量、控制計(jì)劃。

Technical preparation: Carefully study the design drawings and conduct a detailed analysis of the technical parameters such as shape, size, material, and connection method of the irregular hyperbolic steel structure columns. Using BIM (Building Information Modeling) technology to conduct 3D modeling of steel structure columns, simulate the installation process, identify potential issues in advance, such as collisions between components and unreasonable installation sequence, and develop corresponding solutions. At the same time, according to design requirements and regulatory standards, prepare detailed construction plans and quality and safety control plans.

材料與設(shè)備準(zhǔn)備:按照設(shè)計(jì)要求采購(gòu)合格的鋼材,對(duì)鋼材的材質(zhì)、規(guī)格等進(jìn)行嚴(yán)格檢驗(yàn)。對(duì)于異形雙曲鋼結(jié)構(gòu)柱,由于其形狀特殊,可能需要定制加工一些特殊的連接節(jié)點(diǎn)和構(gòu)配件。在設(shè)備方面,準(zhǔn)備好足夠的起重機(jī)、電焊機(jī)、測(cè)量?jī)x器(如全站儀、水準(zhǔn)儀)等施工設(shè)備,并確保設(shè)備性能良好,能夠滿(mǎn)足施工要求。

Material and equipment preparation: Purchase qualified steel according to design requirements, and conduct strict inspections on the material and specifications of the steel. For special-shaped hyperbolic steel structural columns, due to their unique shape, it may be necessary to customize and process some special connection nodes and structural components. In terms of equipment, prepare sufficient construction equipment such as cranes, welding machines, and measuring instruments (such as total stations and level gauges), and ensure that the equipment has good performance and can meet the construction requirements.

場(chǎng)地準(zhǔn)備:清理施工現(xiàn)場(chǎng),設(shè)置好材料堆放區(qū)和構(gòu)件拼裝區(qū)。對(duì)于異形雙曲鋼結(jié)構(gòu)柱的構(gòu)件,由于其形狀復(fù)雜,在堆放時(shí)要做好標(biāo)識(shí)和防護(hù),防止構(gòu)件變形和損壞。同時(shí),在安裝現(xiàn)場(chǎng)要做好基礎(chǔ)處理,確保基礎(chǔ)的平整度和強(qiáng)度符合要求,為鋼結(jié)構(gòu)柱的安裝提供良好的基礎(chǔ)條件。

Site preparation: Clean up the construction site, set up material stacking areas and component assembly areas. For the components of irregular hyperbolic steel structure columns, due to their complex shape, proper labeling and protection should be done during stacking to prevent deformation and damage of the components. At the same time, foundation treatment should be done well at the installation site to ensure that the flatness and strength of the foundation meet the requirements, providing good foundation conditions for the installation of steel structure columns.

頂部節(jié)點(diǎn)安裝

Top node installation

根據(jù)預(yù)先確定的空間坐標(biāo),使用起重機(jī)

Using a crane based on predetermined spatial coordinates

聯(lián)系電話:18765446878

咨詢(xún)熱線:18765446878(微信同號(hào))

地址:禹城市十里望鎮(zhèn)山東國(guó)際商貿(mào)港往南660米

備案號(hào):魯ICP備2023024436號(hào) 魯公網(wǎng)安備37010202001695號(hào) 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

国产精品一区二区毛片| 精品久久久久久18免费网站| 国产激情视频一区二区| 亚洲人成色77777| 国产伦理一区二区三区| 亚洲欧美一区在线观看| 天天日色综合| 日本一区二区高清不卡| 亚洲另类熟女国产精品| 色播av在线| 青草青青在线视频| 欧美精品一区在线观看| 播五月色五开开心五月| 国产女人18毛片水真多成人如厕| 欧美日韩不卡一区二区三区| videosgratis欧美极品| av成人天堂| 国产欧美日韩精品丝袜高跟鞋| 亚洲一区激情| 午夜福利一区二区三区在线观看| xp123精品免费视频| 《桌球上的艳遇》2| 天天躁狠狠躁av| 精品久久久中文字幕人妻| 中文字幕第二十页| 精精国产xxxx视频在线观看| 久久久99视频| 国产成人精品一区二区三区在线观看 | jizz成人国产在线观看免费看| 国产高清视频在线观看一区二区| 亚洲最大AV网站在线观看| 久久久久国产一区二区| 久久久精品少妇| 大屁股肥臀熟女一区二区视频| 在线观看免费中文字幕| 亚洲精品欧美激情| 国产黄色大片网站| 捆绑变态av一区二区三区| 精品人妻av一区二区| 国产美女久久久久| 中文字幕一区久久|